Contractor on High Rise Bridge project works to repair potholes

News
HighRiseBridge_1551193436793.jpg

CHESAPEAKE, Va. (WAVY) — The contractor working on a project to widen Interstate 64 and build a new High Rise Bridge was making pothole repairs along the corridor Monday.

Dispatchers told WAVY.com they received several calls Monday night about a pothole.

An official with the Virginia Department of Transportation said the contractor is scheduled to be back out Thursday night to make additional repairs.

A $409.6 million contract was awarded in 2017 to add six lanes and add one High Occupancy Toll (HOT) lane in each direction and build a new High Rise Bridge adjacent to the existing one.

Stay with WAVY.com for the latest developments.

Copyright 2019 Nexstar Broadcasting, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Don't Miss

WAVY Twitter Widget

WAVY Facebook

Trending stories